Week off equals track work

[dmalbum path=”/wp-content/uploads/dm-albums/Track Work/”/]

With the off week scheduled this week for Lee County Speedway, the crew has taken the help and ideas of Keokuk Contractors to improve the racetrack. The corners have been disced, watered and will be repacked and watered more throughout the next two weeks. Here are a few pictures of the work that was being done. The rocks at the end are the bigger of the many rocks that were pulled from turn one. The track was disced up between 4 and 6 inches.

Leave a Reply